Construction of the Lesosibirsk biotechnological complex in the Yeniseysky district of the Krasnoyarsk Territory

Investor:
Taiga LLC, Segezha Group Management Company LLC
Implementation period:
2022-2028 years
Investment size:
98.7 billion rubles .
Implementation stage:
Financial and economic justification, feasibility study

The project is a modern high-tech and efficient production facility with a single-flow switching pulp line. The pulp and paper mill will be built on an area of about 100 hectares at the industrial site of the group's leading asset, Lesosibirsk LDK No.1. Currently, the construction roadmap has been fully formed, the infrastructure study has been completed, detailed technical design and preparation for the construction permit procedure are underway.


An enterprise for the deep complex processing of wood raw materials for the production of cellulose and a wide range of other biological products that can be used to replace fossil materials and fuels will be built. When reaching the design capacity, the average production volume of bleached coniferous and/or deciduous sulfate pulp will be about 700 thousand tons per year.