Construction of the Elegest – Kyzyl–Kuragino railway, JSC TEPK Kyzyl–Kuragino

Investor:
JSC "Russian Railways" (Krasnoyarsk Railway – branch of JSC "Russian Railways")
Implementation period:
2027 – 2048 years
Investment size:
234.4 billion rubles .
Implementation stage:
Structuring

Creation of a reference railway line that will connect the Republic of Tyva with the Krasnoyarsk Territory. The project provides for the construction of 512 artificial structures, 8 tunnels, including 2 of them with a length of 0.98 and 3.15 km, 127 bridges with a total length of 16 km.